WATER SUPPLY, SEWERAGE & SANITARY PROJECTS

1. Detailed Design & Feasibility Study of Water Supply Network for Duhanas, Lapardha, Orizaj, Velabisht Villages.
Client: Berat, The General Water and Sewerage Company
Period: 2020
Activities performed: Data Collection and Analysis, Topographic survey of water supply infrastructure, Bathymetric measurement survey on the river stream water intake 0.5km, Hydraulic structure Works design, Preparation of the Hydraulic and hydrology Report, hydraulic calculations, Preparation of Bill of quantities and technical specifications, Preparation of technical hydraulic reports.
Investment Cost: 4 Mil Eu

2. Detailed Design & Feasibility Study of Water Supply Network for Stror, Kotorr, Liras Villages
Client: Gramsh, The General Water and Sewerage Company
Period: 2021
Activities performed: Data Collection and Analysis, Topographic survey of water supply infrastructure. Hydraulic structure Works design, Preparation of the Hydraulic and hydrology Report, hydraulic calculations, Preparation of Bill of quantities and technical specifications, Preparation of technical hydraulic reports.
Investment Cost: 0.73 Mil Eu

WATER SUPPLY, SEWERAGE & SANITARY PROJECTS

3. Detailed Design & Feasibility Study of Water Supply Network for  Velce, Vajze, Treblove, Ramice Villages
Client: Selenice, The General Water and Sewerage Company
Period: 2021
Activities performed: Data Collection and Analysis, Topographic survey of water supply infrastructure. Hydraulic structure Works design, Preparation of the Hydraulic and hydrology Report, hydraulic calculations, Preparation of Bill of quantities and technical specifications, Preparation of technical hydraulic reports.
Investment Cost: 1.71 Mil Eu

4. Detailed Design & Feasibility Study of Water Supply Network for Golem Village
Client: Gjirokaster, The General Water and Sewerage Company
Period: 2021
Activities performed: Data Collection and Analysis, Topographic survey of water supply infrastructure. Hydraulic structure Works design, Preparation of the Hydraulic and hydrology Report, hydraulic calculations, Preparation of Bill of quantities and technical specifications, Preparation of technical hydraulic reports.
Investment Cost: 0.48 Mil Eu

5. Detailed Design & Feasibility Study of Waste Water Network for Belsh City
Client: Belsh, The General Water and Sewerage Company
Period: 2020
Activities performed: Data Collection and Analysis, Topographic survey of waste water infrastructure, Hydraulic structure Works design, Preparation of the Hydraulic and hydrology Report, hydraulic calculations, Preparation of Bill of quantities and technical specifications, Preparation of technical hydraulic reports.
Investment Cost: 0.67 Mil Eu

6. Detailed Design & Feasibility Study of Water Supply Network for Cepe Village
Client: Belsh, The General Water and Sewerage Company
Period: 2019

7. Project for the reconstruction and modification of the Wastewater Treatment Plant and the addition of elements to improve the operation of Bajkaj Landfill
Client: Sarande Municipality
Period: 2020

8. Services: Design of Water supply and Sewage Network for Shkodra city , and Bahcallek and Trush Pumping stations, GIS Study
ClientPIU WATER SUPPLY DIRECTORY AND WORLD BANK-SUB-CONTRACTED services
Period: 2011